top of page
TRINIDAD AND TOBAGO CIVIL AVIATION AUTHORITY

The base building was designed under the past directorship of G+P

interior fit-out
project data

Project Type:
Commercial

Services provided:

Interior Design
Furniture Selection
Contract Administration

This project consists of three main  buildings to  house  administration,  training and flight control operations. There are  also two service buildings which house  main plant and equipment. 

The buildings are arranged in a campus setting with parking and pedestrian walkways connecting the buildings. 

The interior fit out was considered very early in the design stage  which allowed for  the co-ordination  of the lighting, air conditioning and other services within the base building contract.  

The base building was competed under a main contractor followed by the implementation of the interior design fit-out under a separate contract. G+P provided the project management and contract administration

Location: 

Client:

Floor Area: 

Completion: 

Piarco

Civil Aviation Authority

112,000 sqft

2012

bottom of page